While the shop drawing is the original design of the structure and includes no revisions. From the engineering perspective, it is the Process P&IDs that need to be. The construction drawing includes the modifications and revisions taking place as the project proceeds. From the term, 'As-Built' itself one can fathom the drawings reflect what has been actually built at the plant site. Construction drawings are legally significant drawing as it includes the documents for the legal agreement between the employer and the contractor. Such representations may range from drawings of buildings to electrical schematics to process flow diagrams. On the other hand, the construction drawing is a bit different from the shop drawing. It becomes the basis for the construction after the approval from the construction team. The Shop drawing is the original design of the building and it is created before the construction actually begins on the ground. The flowchart of Redline Markup and As Built Drawings shows how the redlines shall be prepared following the approval and implementation of each construction activity. The various installation details of the components along with doors and windows are also included in the shop drawings. It not only includes the overall design of the building but also includes the interface coordination of MEP, Interior components, and precise details of other components to be installed on site. A shop drawing is prepared by the contractor.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |